Welcome

You are all welcome to this site!

This site is intended to solve the problems of MBA students (IGNOU University) regarding their assignments. Your contribution is vital in success of this blog's mission. You can also send your contribution (Assignments answers) at kvrajan6@gmail.com . I will try to upload it as quickly as possible.

...Rajan

Showing posts with label ms-05 mba assignment july dec 2010. Show all posts
Showing posts with label ms-05 mba assignment july dec 2010. Show all posts

Monday, October 11, 2010

ms-05 mba assignment july dec 2010 Question 5

Q5) Write Short notes on the following:

          a) Waste Management.
          b) Work Measurement.
          c) Acceptance sampling.
Solution:


(a)Waste management

            Waste management is the collection, transport, processing, recycling or disposal of waste materials. The term usually relates to materials produced by human activity, and is generally undertaken to reduce their effect on health, aesthetics or amenity. Waste management is also carried out to reduce the materials' effect on the environment and to recover resources from them. Waste management can involve solid, liquid or gaseous substances, with different methods and fields of expertise for each.

            Waste management practices differ for developed and developing nations, for urban and rural areas, and for residential and industrial, producers. Management for non-hazardous residential and institutional waste in metropolitan areas is usually the responsibility of local government authorities, while management for non-hazardous commercial and industrial waste is usually the responsibility of the generator. Waste management methods for vary widely between areas for many reasons, including type of waste material, nearby land uses, and the area available.

            An example of waste management through composting is the Green Bin Program in Toronto, Canada, where household organic waste (such as kitchen scraps and plant cuttings) are collected in a dedicated container and then composted. The energy content of waste products can be recycled by using them as fuel. Recycling through thermal treatment ranges from using waste as a fuel source for cooking or heating, to fuel for boilers to generate steam and electricity in a turbine. Pyrolysis and gasification are two related forms of thermal treatment where waste materials are heated to high temperatures with limited oxygen availability. The process typically occurs in a sealed vessel under high pressure. Pyrolysis of solid waste converts the material into solid, liquid and gas products. The liquid and gas can be burnt to produce energy or refined into other products. The solid residue (char) can be further refined into products such as activated carbon. Gasification is used to convert organic materials directly into a synthetic gas (syngas) composed of carbon monoxide and hydrogen. The gas is then burnt to produce electricity and steam.


(b)Work Measurement
            Work Measurement is a term which covers several different ways of finding out how long a job or part of a job should take to complete. It can be defined as the systematic determination, through the use of various techniques, of the amount of effective physical and mental work in terms of work units in a specified task. The work units usually are given in standard minutes or standard hours. Why should we need to know how long a job should take? The answer to this question lies in the importance of time in our everyday life. We need to know how long it should take to walk to the train station in the morning, one needs to schedule the day's work and even when to take out the dinner from the oven.

In the business world these standard times are needed for:
   1. Planning the work of a workforce,
   2. Manning jobs, to decide how many workers it would need to complete certain jobs,
   3. Scheduling the tasks allocated to people
   4. Costing the work for estimating contract prices and costing the labor content in
       general
   5. Calculating the efficiency or productivity of workers - and from this:
   6. Providing fair returns on possible incentive bonus payment schemes.

            On what are these standard times set? They are set, not on how long a certain individual would take to complete a task but on how long a trained, experienced worker would take to do the task at a defined level of pace or performance. Who sets these standard times? Specially trained and qualified observers set these times, using the most appropriate methods or techniques for the purpose i.e. "horses for courses”. How it is done depends on circumstances that obtain. The toolkit available to the comprehensively trained observer is described below. The reader is invited to search the individual methods on this current Website. Selecting the most appropriate methods of work measurement The method chosen for each individual situation to be measured depends on several factors which include:

   1. The length on the job to be measured in time units

   2. The precision which is appropriate for the type of work in terms of time units (i.e
       should it be in minutes, hundredths or thousandths of a minute)

   3. The general cycle-time of the work, i.e. does it take seconds, minutes or days to
       complete

            The length of time necessary for the completion of the range of jobs can vary from a few seconds in highly repetitive factory work to several weeks or months for large projects such as major shutdown maintenance work on an oil refinery. It is quite clear that using a stop-watch, for example, on the latter work would take several man-years to time to measure! Thus, more "overall" large-scale methods of timing must be employed. The precision is an important factor, too. This can vary from setting times of the order of "to the nearest thousandth of a minute" (e.g. short cycle factory work) to the other end of the scale of "to the nearest week" (e.g. for large project work). These are the dominant factors that affect the choice of method of measurement.


(c)Acceptance sampling
            Acceptance sampling uses statistical sampling to determine whether to accept or reject a production lot of material. It has been a common quality control technique used in industry and particularly the military for contracts and procurement Acceptance sampling uses statistical sampling to determine whether to accept or reject a production lot of material. It has been a common quality control technique used in industry and particularly the military for contracts and procurement. Acceptance sampling is a procedure used for sentencing incoming batches. The most widely used plans are given by the Military Standard tables, which were developed during World War II.

Sampling plans can be categorized across several dimensions:
·         Sampling by attributes vs. sampling by variables: When the item inspection leads to a binary result (either the item is conforming or nonconforming) or the number of nonconformities in an item are counted, then we are dealing with sampling by attributes. If the item inspection leads to a continuous measurement, then we are sampling by variables.

·         Incoming vs. outgoing inspection: If the batches are inspected before the product is shipped to the consumer, it is called outgoing inspection. If the inspection is done by the consumer, after they were received from the supplier, it is called incoming inspection.

·         Rectifying vs. non-rectifying sampling plans: Determines what is done with nonconforming items that were found during the inspection. When the cost of replacing faulty items with new ones, or reworking them is accounted for, the sampling plan is rectifying.

·         Single, double, and multiple sampling plans: The sampling procedure may consist of drawing a single sample, or it may be done in two or more steps. A double sampling procedure means that if the sample taken from the batch is not informative enough, another sample is taken. In multiple sampling, additional samples can be drawn after the second sample.

ms-05 mba assignment july dec 2010 Question 4

Q4) What are the distinct features of job production as compared to mass and batch production Systems?

Solution:

Job production
            Job production involves producing a one-off product for a specific customer. Job production is most ften associated with small firms (making railings for a specific house, building/repairing a computer for a specific customer, making flower arrangements for a specific wedding etc.) but large firms use job production too. Examples include: Designing and implementing an advertising campaign Auditing the accounts of a large PUBLIC COMPANY. Building a new factory Installing machinery in a factory Key benefits of job production include: work is generally of a high quality a high level of customisation is possible to meet the customer's exact requirements significant flexibility is possible, especially when compared to mass production. Workers can be easily motivated due to the skilled nature of the work they are performing.
Disadvantages include:
            Higher cost of production requires the use of specialist labour (compare with the repetitive, low-skilled jobs in mass  production.slow compared to other methods of  production.Essential featuresThere are a number of features that should be implemented in a job production environment, they include:Clear definitions of objectives should be set. Clearly outlined decision making process:          

MOSTLY LARGE CONSTRUCTION COMPANIES:              
BECTHEL CORPORATION [US]:     
            Batch production is a manufacturing   used to produce or process any product in BATCHES, as opposed to a CONTINUOUS PRODUCTION process, or a one-off production. The primary characeristic of batch production is that all components are completed at a workstation before they move to the next one. Batch production is popular in bakeries and in the manufacture of sports shoes, pharmaceutical ingredients, inks, paints and adhesives. In the manufacture of inks and paints, a technique called a colour-run is used. A colour-run is where one manufactures the lightest color first, such as light yellow followed by the next increasingly darker colour such as orange, then red and so on until reaching black and then starts over again. This minimizes the cleanup and reconfiguring of the machinery between each batch. White (by which is meant opaque paint, not transparent ink) is the only colour that cannot be used in a colour run due to the fact that a small amount of white pigment can adversely affect the medium colours.
There are inefficiencies associated with batch production. The production equipment must be stopped, re-configured, and its output tested before the next batch can be produced.

            Time between batches is known as 'down time'. Batch production is useful for a factory that makes seasonal items or products for which it is difficult to FORECAST demand. There are several advantages of batch production; it can reduce initial capital outlay because a single production line can be used to produce several  PRODUCTS. As shown in the example, batch production can be useful for small businesses who cannot afford to run continuous production lines. Also, companies can use batch production as a trial run. If a retailer buys a batch of a product that does not sell then the producer can cease production without having to sustain huge losses.

MOST PHARMACEUTICAL COMPANIES:   
PFIZER BAXTER [US]:
            Mass production (also called flow production, repetitive flow production, or series production) is the production of large amounts of standardized products on PRODUCTION LINES. Mass production typically uses moving tracks or conveyor belts to move partially complete products to workers, who perform simple repetitive tasks to permit very high rates of production per worker, allowing the high-volume manufacture of inexpensive finished goods. Mass production is Capital intensive, as it uses a high proportion of machinery in relation to workers. With fewer labour costs and a faster rate of production, capital is increased while expenditure is decreased. However the machinery that is needed to set up a mass production line is so expensive that there must be some assurance that the product is to be successful so the company can get a return on its investment. Machinery for mass production such as ROBOTS and Machine Presses have high installation costs as well. Thus, mass production is ideally suited to serve large, relatively homogenous populations of consumers, whose demand would satisfy the long production runs required by this method of manufacturing. As such, it is not surprising that, given a number of other factors, mass production first became prevalent in the United States.
One of the descriptions of mass production is that the craftsmanship is in the workbench itself, not the training of the worker; rather than having a skilled worker measure every dimension of each part of the product against the plans or the other parts as it is being formed, there are JIGS and GAUGE BLOCKS  that are ready at hand to ensure that the part is made to fit this set-up. It has already been checked that the finished part will be to specifications to fit all the other finished parts - and it will be made quicker, with no time spent on finishing the parts to fit one another. This is the specialized capital required for mass production; each workbench is different and each set of tools at each workbench limited to those necessary to make one part. As each of these parts is uniformly and consistently constructed, interchangeability of components is thus another hall mark of mass produced goods.

Use of assembly lines in mass production:
            Mass production systems are usually organized into assembly lines. The assemblies pass by on a conveyor, or if they are heavy, hung from an overhead monorail.
In a factory for a complex product, rather than one assembly line, there may be many auxiliary assembly lines feeding sub-assemblies (i.e. car engines or seats) to a backbone "main" assembly line. A diagram of a typical mass-production factory looks more like the skeleton of a fish than a single line.     

Advantages and disadvantages:
            The economies of mass production come from several sources. The primary cause is a reduction of nonproductive effort of all types. In craft production, the craftsman must bustle about a shop, getting parts and assembling them. He must locate and use many tools many times for varying tasks. In mass production, each worker repeats one or a few related tasks that use the same tool to perform identical or near-identical operations on a stream of products. The exact tool and parts are always at hand, having been moved down the assembly line consecutively. The worker spends little or no time retrieving and/or preparing materials and tools, and so the time taken to manufacture a product using mass production is shorter than when using traditional methods.
The probability of human error and variation is also reduced, as tasks are predominantly carried out by machinery. A reduction in labour costs, as well as an increased rate of production, enables a company to produce a larger quantity of one product at a lower cost than using traditional, non-linear methods. However, mass production is inflexible because it is difficult to alter a design or production process after a production line is implemented. Also, all products produced on one production line will be identical or very similar, and introducing variety to satisfy individual tastes is not easy. However, some variety can be achieved by applying different finishes and decorations at the end of the production line if necessary.                                               

MOSTLY MOTOR VEHICLES:
FORD MOTORS [US]                                               
GENERAL MOTORS [US]                                                      
FLOW PRODUCTION:
            Flow production involves a continuous movement of items through the production process. This means that when one task is finished the next task must start immediately. Therefore, the time taken on each task must be the same. Flow production (often known as mass production) involves the use of production lines such as in a car manufacturer where doors, engines, bonnets and wheels are added to a chassis as it moves along the assembly line. It is appropriate when firms are looking to produce a high volume of similar items. Some of the big brand names that have consistently high demand are most suitable for this type of production:
Heinz baked beans Kellogg’s cornflakes Marsbars                             

Advantages:
            Flow production is capital intensive. This means it uses a high proportion of machinery in relation to workers, as is the case on an assembly line. The advantage of this is that a high number of products can roll off assembly lines at very low cost. This is because production can continue at night and over weekends and also firms can benefit from economies of scale, which should lower the cost per unit of production.

Disadvantages:
            The main disadvantage is that with so much machinery it is very difficult to alter the production process. This makes production inflexible and means that all products have to be very similar or standardised and cannot be tailored to individual tastes. However some “variety” can be achieved by applying different finishes, decorations etc at the end of the production line




ms-05 mba assignment july dec 2010 Question 3

Q.3 List the important factors that must be addressed in job design and briefly discuss the importance of each one.

Solution:  JOB DESIGN is the process of putting together various elements to form a job, bearing in mind organizational and individual worker requirements, as well as considerations of health, safety, and ergonomics. The scientific management approach of Frederick Winslow Taylor viewed job design as purely mechanistic, but the later human relations movement rediscovered the importance of workers' relationship to their work and stressed the importance of job satisfaction. Job design refers to the way that a set of tasks, or an entire job, is organized. Job design helps to determine. It takes into account all factors which affect the work, and organizes the content and tasks so that the whole job is less likely to be a risk to the employee. Job design involves administrative areas such as:  job rotation,  job enlargement,  task/machine pacing,  work breaks, and  working hours.  A well designed job will encourage a variety of 'good' body positions, have reasonable strength requirements, require a reasonable amount of mental activity, and help foster feelings of achievement and self-esteem.

Management viewed job design since the industrial revolution in the approaches to Job Design USING SOCIO TECHNICAL SYSTEMS  There are three important approaches to job design, viz.,  Engineering approach,  Human approach and  The Job characteristic approach.  Engineering Approach
The most important single element in the Engineering approaches, proposed by FW Taylor and others, was the task idea, "The work of every workman is fully planned out by the management at least one day in advance and each man receives in most cases complete written instructions, describing in detail the task which he is to accomplish . . . This task specifies not only what is to be done but how it is to be done and the exact time allowed for doing it." The principles offered by scientific management to job design can be summarized thus:
l Work should be scientifically studied. As advocated fragmentation and reutilization of work to reap the advantages of specialization.
l Work should be arranged so that workers can be efficient.
l Employees selected for work should be matched to the demands of the job.
l Employees should be trained to perform the job.
l Monetary compensation should be used to reward successful performance of the job.
These principles to job design seem to be quite rational and appealing because they point towards increased organisational performance. Specialisation and routinisation over a period of time result in job incumbents becoming experts rather quickly, leading to higher levels of output. Despite the assumed gains in efficiency, behavioural scientists have found that some job incumbents dislike specialised and routine jobs.

Human Relations Approach
The human relations approach recognised the need to design jobs in an interesting manner. In the past two decades much work has been directed to changing jobs so that job incumbents can satisfy their needs for growth, recognition and responsibilility, enhancing need satisfaction through what is called job enrichment. One widely publicised approach to job enrichment uses what is called job characteristics model and this has been explained separately in the ensuing section.
Two types of factors, viz. (i) motivators like achievements, recognition, work itself, responsibility, advancement and growth and (ii) hygiene factors (which merely maintain the employee on the job and in the organization) like working conditions, organisational policies, inter-personnel relations, pay and job security. The employee is dissatisfied with the job if maintenance factors to the required degree are not introduced into the job. But, the employee may not be satisfied even if the required maintenance factors are provided. The employee will be satisfied with his job and he will be more productive if motivators are introduced into the job content. As such, he asserts that the job designer has to introduce hygienic factors adequately to reduce dissatisfaction and build motivating factors. Thus, THE emphasis is on the psychological needs of the employees in designing jobs.

The Job Characteristics Approach
The Job Characteristics Theory states that employees will work hard when they are rewarded for the work they do and when the work gives them satisfaction. Hence, they suggest that motivation, satisfaction and performance should be integrated in the job design. According to this approach, any job can be described in terms of five core job dimensions which are defined as follows:
(a) Skill variety: The degree to which the job requires that workers use a variety of different activities, talents and skills in order to successfully complete the job requirements.
(b) Task identity: The degree to which the job allows workers to complete whole tasks from start to finish, rather than disjointed portions of the job.
(c) Task significance: The degree to which the job significantly impacts the lives of others both within and outside the workplace.
(d) Autonomy: The degree to which the job allows workers freedom in planning and scheduling and the methods used to complete the job.
(e) Feedback: The degree to which the job itself provides workers with clear, direct and understandable knowledge of their performance.
All of the job dimensions impact workers psychologically. The first three dimensions affect whether or not workers view their job as meaningful. Autonomy determines the extent of responsibility workers feel. Feedback allows for feelings of satisfaction for a job well done by providing knowledge of results.
The core job dimensions can be combined into a single predictive index called the Motivating Potential Score. Its computation is as follows:
Motivating Skill variety + Task identity + Task significance
potential = x Autonomy x Feedback
score
Jobs that are high on motivating potential must be high at least in one of the three factors that lead to meaningful work and must be high in both autonomy and feedback and vice versa. These three critical psychological states lead to the outcome such as (a) high internal work motivation, (b) high growth satisfaction, (c) high quality work performance, (d) high general job satisfaction, (e) high work effectiveness and (f) low absenteeism and turnover . The model says that internal rewards are obtained by an individual when he learns that he personally has performed well on a task that he cares about.

Sunday, October 10, 2010

ms-05 mba assignment july dec 2010 Question 2

Define value engineering and analysis. Discuss at least one method of the  approach for VE/VA.
Solution: Value Engineering is a systematic method to improve the "Value" of goods and services by using an examination of function. Value, as defined, is the ratio of Function to Cost. Value can therefore be increased by either improving the Function or reducing the cost. It is a primary tenet of Value Engineering that basic functions be preserved and not be reduced as a consequence of pursuing Value improvements.  Value Engineering is a body of knowledge as a technique in which the value of a system's outputs is optimized by crafting a mix of performance (Function) and costs. In most cases this practice identifies and removes unnecessary expenditures, thereby increasing the value for the manufacturer and/or their customers.  Value Engineering uses rational logic (a unique "how" - "why" questioning technique) and the analysis of Function to identify relationships that increase Value. It is considered a quantitative method similar to the Scientific Method, which focuses on Hypothesis - Conclusion to test relationships, and Operations Research, which uses model building to identify predictive relationships.


VALUE ANALYSIS -- The Job Plan
Value Engineering is often done by systematically following a multi-stage Job Plan. IT IS a 8-step procedure , called the Value Analysis Job Plan. Others have varied the Job Plan to fit their constraints. One modern version has the following eight steps: PREPARATION
INFORMATION
ANALYSIS
CREATION
EVALUATION
DEVELOPMENT
PRESENTATION
FOLLOW-UP
Four basic steps in the VALUE ANALYSIS Job Plan are:
Information gathering - This asks what the requirements are for the object. Function analysis, an important technique in value engineering, is usually done in this initial stage. It tries to determine what functions or performance characteristics are important. It asks questions like; What does the object do? What must it do? What should it do? What could it do? What must it not do?
Alternative generation (Creation) - In this stage value engineers ask; What are the various alternative ways of meeting requirements? What else will perform the desired function?
Evaluation - In this stage all the alternatives are assessed by evaluating how well they meet the required functions and how great will the cost savings be.
Presentation - In the final stage, the best alternative will be chosen and presented to the client for final decision.
Value engineering is an approach to productivity improvement that attempts to increase the value obtained by a customer of a product by offering the same level of functionality at a lower cost.
Value engineering is sometimes used to apply to this process of cost reduction prior to manufacture, while "value analysis" applies the process to products currently being manufactured.  Both attempt to eliminate costs that do not contribute to the value and performance of the product (or service, but the approach is more common in manufacturing).  Value engineering, thus, critically examines the contribution made to product value by each feature of a design. It then looks to deliver the same contribution at lower cost.  Different types of value are recognized by the approach :
Use value relates to the attributes of a product which enable it to perform its function.
Cost value is the total cost of producing the product.
Esteem value is the additional premium price which a product can attract because of its intrinsic attractiveness to purchasers.
Exchange value is the sum of the attributes which enable the product to be exchanged or sold.  Although the relative magnitude of these different types of value will vary between products, and perhaps over the life of a product, VE attempts to identify the contribution of each feature to each type of value through systematic analysis and structured creativity enhancing techniques.  Value engineering programs are best delivered by multi-skilled teams consisting of designers, purchasing specialists, operations personnel, and financial analysts.  Pareto analysis is often used to prioritise those parts of the total design that are most worthy of attention. These are then subject to rigorous scrutiny. The team analyses the function and cost of those elements and tries to find any similar components that could do the same job at lower cost.
Common results are a reduction in the number of components, the use of cheaper materials, or a simplification of the process
================================================
VALUE ENGINEERING CAN BE APPLIED TO ANY MANUFACTURING,
HERE IS AN EXAMPLE OF TRACTOR MANUFACTURING
FIRM IN THE FOLLOWING AREAS

1.TRACTOR DESIGN
-make the design simple
- easy to use
-reduce COMPLICATED / expensive parts.
---------------------------------------------------------
2.TRACTORS RAW MATERIAL / PARTS PROCUREMENT
-establish the demand planning system [ reduce the fluctuations in production]
-establish the inventories of raw materials [ reduce the cost of stock holding]
-establish the economic order quantity [ """"""""""""""""""""""""""""""]
------------------------------------------------------------------------------
3. TRACTORS PRODUCTION PLANNING
-establish an effective / efficient production planning system [ cost savings]
------------------------------------------------------------------------------
4.TRACTORS PRODUCTION
-establish a lean production [ cost effective]
----------------------------------------------------------------------
5. TRACTORS TOTAL QUALITY ASSURANCE.
-set up quality assurance system to reduce quality problems/ rejections]
[ cost savings ]
-------------------------------------------------------------
6.TRACTORS FINISHED GOOD INVENTORY
-match the finished stock inventory to market demand / sales requirements]
[ cost saving in stock holding ]
--------------------------------------------------------------------
7.TRACTORS CUSTOMER SERVICE
-provide effective customer order processing/order service/
timely despatch to customers.
[ adds value to customers / reduces distribution cost]
----------------------------------------------------------------------------
8.TRACTORS AFTER SALES SERVICE
-offer warranty/ after sales service to customers
[ adds value to the product and increases sales ]
============================================
TRACTORS MANUFACTURER CAN ADD VALUE/ REDUCE COST
BY APPLYING THE VALUE ANALYSIS -JOB PLAN TO EACH
OF THE ABOVE LISTED 8 STAGES OF TRACTORS MANUFACTURING.
===============================================================

Friday, October 8, 2010

ms-05 mba assignment july dec 2010 Question 1

1.      Discuss the Linkage among the volume, variety, Production System and Plant Layout. Elaborate your understanding about assembly line balancing.

Solution:

            Volume is how much three-dimensional space a substance (solid, liquid, gas, or plasma) or shape occupies or contains often quantified numerically using the SI derived unit, the cubic metre. The volume of a container is generally understood to be the capacity of the container, i. e. the amount of fluid (gas or liquid) that the container could hold, rather than the amount of space the container itself displaces. The volume of a solid (whether regularly or irregularly shaped) can be determined by fluid displacement. Displacement of liquid can also be used to determine the volume of a gas. The combined volume of two substances is usually greater than the volume of one of the substances. However, sometimes one substance dissolves in the other and the combined volume is not additive.

            Variety is a weekly entertainment-trade magazine founded in New York City, New York, in 1905 by Sime Silverman. With the rise of the importance of the motion-picture industry, Daily Variety, a daily edition based in Los Angeles, California, was founded by Silverman in 1933. In 1998, the Daily Variety Gotham edition, based in New York City was added. All three have been in continual operation since.The magazine is owned by Reed Business Information, a division of Reed Elsevier, with three print editions and a website. For twenty years its editor-in-chief was Peter Bart, who worked previously at Paramount Pictures and The New York Times. In April 2009, it was announced that Bart was moving to the position of "vice president and editorial director", characterised online as "Boffo No More: Bart Up and Out at Variety". The current editor is Timothy M. Gray
            A production system (or production rule system) is a computer program typically used to provide some form of artificial intelligence, which consists primarily of a set of rules about behavior. These rules, termed productions, are a basic representation found useful in automated planning, expert systems and action selection. A production system provides the mechanism necessary to execute productions in order to achieve some goal for the system. Productions consist of two parts: a sensory precondition (or "IF" statement) and an action (or "THEN"). If a production's precondition matches the current state of the world, then the production is said to be triggered. If a production's action is executed, it is said to have fired. A production system also contains a database, sometimes called working memory, which maintains data about current state or knowledge, and a rule interpreter. The rule interpreter must provide a mechanism for prioritizing productions when more than one is triggered.

            Plant Layout is the economic construction and operation of a process unit will depend on how well the plant equipment specified on the process flow sheet and laid out.

The principal factors to be considered are:
        1. Economic consideration: construction and operation cost.
        2. The process requirement
        3. Convenience of operation
        4. convenience of maintenance
        5. Safety
        6. Future expansion
        7. Modular construction
COSTS:
            The cost of construction can be minimized by adopting a layout that gives shortest run of connecting pipes between equipment, and adopting the least amount of structural steel work. However, this will not necessarily be the best arrangement for operation and maintenance.
PROCESS REQUIREMENT:
            All the required equipments have to be placed properly within process. Even the installation of the auxiliaries should be done in such a way that it will occupy the least space.

OPERATION:
            Equipment that needs to have frequent operation should be locate Convenient to the control room. Valves, sample points, and instruments should be located at convenient position and height. Sufficient working space and headroom must be provided to allow easy access to equipment.
MAINTENANCE:
            Heat exchangers need to be sited so that the tube bundles can be easily withdrawn for cleaning and tube replacement. Vessels that require frequent replacement of catalyst or packing should be located on the outside of buildings. Equipment that requires dismantling for maintenance, such as compressors and large pumps, should be placed under cover.

SAFETY
            Blast walls may be needed to isolate potentially hazardous equipment, and confine the effects of an explosion. At least two escape routes for operator must be provided from each level in the process building

PLANT EXPANSION:
            Equipment should be located so that it can be conveniently tied in with any future expansion of the process. Space should be left on pipe alleys for future needs, service pipes oversized to allow for future requirements.


MODULAR CONSTRUCTION:
            In recent years, there has been a move to assemble sections of the plant at the manufacturer site. These modules will include the equipment, structural steel, piping and instrumentation. The modules then transported to the plant site, by road or sea.

ASSEMBLY LINE BALANCING
Line and work cell balancing is an effective tool to improve the through Output of assembly lines and work cells while reducing manpower requirements and costs. Assembly Line Balancing, or simply Line Balancing (LB), is the problem of assigning operations to workstations along an assembly line, in such a way that the assignment be optimal in some sense. Ever since Henry Ford’s introduction of assembly lines, LB has-been an optimization problem of significant industrial importance: the efficiency difference between an optimal and a sub-optimal assignment can yield economies (or waste) reaching millions of dollars per year.
LB is a classic Operations Research (OR) optimization problem, having been tackled by OR over several decades. Many algorithms have been proposed for the problem. Yet despite the practical importance of the problem, and the OR efforts that have been made to tackle it, little commercially available software is available to help industry in optimizing their lines. In fact, according to a recent survey by Becker and Scholl (2004), there appear to be currently just two commercially available packages featuring both a state of the art optimization algorithm and a user-friendly interface for data management. Furthermore, one of those packages appears to handle only the “clean “formulation of the problem (Simple Assembly Line Balancing Problem, or SALBP), which leaves only one package available for industries such as automotive. This situation appears to be paradoxical, or at least unexpected: given the huge economies LB can generate, one would expect several software packages vying to grab a part of those economies.
It appears that the gap between the available OR results and their dissemination in today’s industry, is probably due to a misalignment between the academic LB problem addressed by most of the OR approaches, and the actual problem being faced by the industry. LB is a difficult optimization problem (even its simplest forms are NP-hard –see Garey and Johnson, 1979), so the approach taken by OR has typically been to simplify it, in order to bring it to a level of complexity amenable to OR tools. While this is a perfectly valid approach in general, in the particular case of LB it led to some definitions of the problem that ignore many aspects of the real-world problem. Unfortunately, many of the aspects that have been left out in the OR approach are in fact crucial to industries such as automotive, in the sense that any solution ignoring (violating)those aspects becomes unusable in the industry.